Nimla to Kabul.
January 1976
After joining the main Jalalabad-Kabul highway, the road passes through a large tunnel opened in 1963, and runs along the banks of the Darunta Reservoir which was formed when the Soviets constructed a hydroelectric power station at Darunta in 1964. It is now (2016) in very poor condition because of silting and damage during the recent civil war.
- Filename
- A-76-2.jpg
- Copyright
- acku Afghanistan
- Image Size
- 6393x4232 / 4.6MB
- Contained in galleries
- NIJRAO-TAGAO-JALALABAD-NIMLA