Info

Naghlu Complex and Bridge.

25 April 1976
Constructed with Soviet assistance in the 1960s and 70s. in 1974 the station reached its design capacity of 90000 kw.

Add to Lightbox Download
Filename
A-76-1076.jpg
Copyright
acku Afghanistan
Image Size
6361x4247 / 5.9MB
Contained in galleries
NIJRAO-TAGAO-JALALABAD-NIMLA
25 April 1976<br />
Constructed with Soviet assistance in the 1960s and 70s. in 1974 the station reached its design capacity of 90000 kw.